This project involves the reconfiguration of the existing track and the installation of a new track surface. In effect, the track will be enlarged, adjusting the turning radii of the curves on one or both sides as necessary to maximize running and training purposes. All lanes will be widened, new lights will be installed on the eastern side of the track, and a new timing system will be installed. Includes new discus throw, shot put, long and high jump, and steeplechase.
| Location: |
Chieftan Way
Tallahassee, FL |
| Owner: |
FSU - Facilities Design & Construction |
|
Architect: |
PBS&J - Terry Peterson |
|
Final Contract Amount: |
$1,545,000.00 |
|
Actual Completion: |
December 2002 |
|
Service Line: |
Education Post Secondary, Sport/Leisure |
|